Outline of the most important projects in the last four years:
		
	
Promarol Plus - Poland
Blood coagulation line
Year of completion: 2004
Description:
o Coagulator – hot steam coagulation
o Centrifuge line
o Continuous feeding of the destruction line
o Design and supply of M&R (measurement and regulation)
	
Agro farm cooperative Jevišovice – the Czech Republic
Disintegration and feeding line for dry fermentation
		
		Year of completion: 2004
		Description:
		o Design
		o One-rotor disintegration machine 
		o Automated feeding conveyor made of steel laths
		
	
Promarol Plus - Poland
The end part of the destruction line - finishing and packaging of the meat bone meal 
		Year of completion: 2005
		Description:
		o Design
		o Vibration sieve for the beat bone meal
		o Feeding worm conveyors
		o Bagging scales
		
	
Promarol Plus - Poland
Fat sediments separation line
		Year of completion: 2005
		Description:
		o Design
		o Centrifuge line
		o Sedimentation basin
		o Design and supply of M&R 
		
	
ZEVO Citonice – Czech Republic
Biogas station Velký Karlov
		Year of completion: 2006
		Description:
		o Hydrolysis line to process material of categories II and III.
		o Finishing of the design work.
		o Design and supply of M&R 
		o Processing of slaughterhouse waste, slurry and corn ensilage
		o Current output 1,4MWel
		
	
Heating plant Lassnitzhohe - Austria
Supply of parts of the biomass heat production unit
		Year of completion: 2006
		Description:
		o supply of two extra large pressure boilers
		
	
Promarol Plus - Poland
Processing line for rendering plant waste of categories I and II
		Year of completion: 2007
		Description:
		o Project at the stage of building construction 
		o General design work
		o Organization of construction
		o Supply of the technological part
		
	
BPS Pacov - Czech Republic
Biogas station for the poultry farm Pacov
		Year of completion: 2008
		Description:
		o Project at the stage of the approved building permission
		o Processing of slops (alcohol distillation waste), slurry and poultry bedding
		o Anticipated output 500kWel
		
	
>BPS TOZOS - the Czech Republic
Biogas station for the farm "Forest Court" - Horní Tošanovice
		Year of completion: 2007
		Description:
		o Design and approval of the building permission
		o Hydrolysis line
		o Processing of slaughterhouse waste, slurry and corn ensilage
		o Anticipated output 500kWel
		
	
BPS SLOVLIKER - Czech Republic
Biogas station for the distillery
		Year of completion: 2008
		Description:
		o Project at the stage of the approved building permission
		o Processing of slops, slurry and G-phase
		o Anticipated output 1,5 MWel
		
	
BPS LOKVE - Slovinia
Biogas station for processing of kitchen wastes
		Year of completion: 2007
		Description:
		
		o Hydrolysis line for processing materials of categories II and III
		o Processing of kitchen waste, slaughterhouse waste, ensilage and slurry  
		o Anticipated output 1,6MWel
		
	
Heating plant Schladmming - Austria
Supply of parts of the biomass heat production unit
		Year of completion: 2007
		Description:
		o Supply of the extra large atypical pressure boiler
		
		
		
		
		
	
© CORAMEXPORT s.r.o.