References

Outline of the most important projects in the last four years:

Promarol Plus - Poland
Blood coagulation line
Year of completion: 2004
Description:
o Coagulator – hot steam coagulation
o Centrifuge line
o Continuous feeding of the destruction line
o Design and supply of M&R (measurement and regulation)

Agro farm cooperative Jevišovice – the Czech Republic

Disintegration and feeding line for dry fermentation
Year of completion: 2004
Description:
o Design
o One-rotor disintegration machine
o Automated feeding conveyor made of steel laths

Promarol Plus - Poland

The end part of the destruction line - finishing and packaging of the meat bone meal
Year of completion: 2005
Description:
o Design
o Vibration sieve for the beat bone meal
o Feeding worm conveyors
o Bagging scales

Promarol Plus - Poland

Fat sediments separation line
Year of completion: 2005
Description:
o Design
o Centrifuge line
o Sedimentation basin
o Design and supply of M&R

ZEVO Citonice – Czech Republic

Biogas station Velký Karlov
Year of completion: 2006
Description:
o Hydrolysis line to process material of categories II and III.
o Finishing of the design work.
o Design and supply of M&R
o Processing of slaughterhouse waste, slurry and corn ensilage
o Current output 1,4MWel

Heating plant Lassnitzhohe - Austria

Supply of parts of the biomass heat production unit
Year of completion: 2006
Description:
o supply of two extra large pressure boilers

Promarol Plus - Poland

Processing line for rendering plant waste of categories I and II
Year of completion: 2007
Description:
o Project at the stage of building construction
o General design work
o Organization of construction
o Supply of the technological part

BPS Pacov - Czech Republic

Biogas station for the poultry farm Pacov
Year of completion: 2008
Description:
o Project at the stage of the approved building permission
o Processing of slops (alcohol distillation waste), slurry and poultry bedding
o Anticipated output 500kWel

>BPS TOZOS - the Czech Republic

Biogas station for the farm "Forest Court" - Horní Tošanovice
Year of completion: 2007
Description:
o Design and approval of the building permission
o Hydrolysis line
o Processing of slaughterhouse waste, slurry and corn ensilage
o Anticipated output 500kWel

BPS SLOVLIKER - Czech Republic

Biogas station for the distillery
Year of completion: 2008
Description:
o Project at the stage of the approved building permission
o Processing of slops, slurry and G-phase
o Anticipated output 1,5 MWel

BPS LOKVE - Slovinia

Biogas station for processing of kitchen wastes
Year of completion: 2007
Description:
o Hydrolysis line for processing materials of categories II and III
o Processing of kitchen waste, slaughterhouse waste, ensilage and slurry
o Anticipated output 1,6MWel

Heating plant Schladmming - Austria

Supply of parts of the biomass heat production unit
Year of completion: 2007
Description:
o Supply of the extra large atypical pressure boiler